4 Small Upgrades to the RETROL TG-6 You May Want to Know | Stirlingkit

4 Small Upgrades to the RETROL TG-6 You May Want to Know | Stirlingkit

4 Small Upgrades to the RETROL TG-6 You May Want to Know | Stirlingkit

4 Small Upgrades to the RETROL TG-6 You May Want to Know

We brought the TG-6 to a model engineering show in the UK and asked builders what they thought. Their feedback shaped four small upgrades for the mass-production version.

RETROL TG-6 steam turbine power plant demo model
Photos show the demo model. The mass-production version includes the small upgrades below.

Before we finalise any model for mass production, we want it tested by the people who will actually build and run it. So we took the RETROL TG-6 demo model to a model engineering show in the UK, where live steam has a long tradition and builders know exactly what they expect from a boiler on their workbench.

We ran it live on the stand, from lighting the fuel to watching the lamp come on. The response was very positive, and we’d like to thank everyone who stopped by, asked questions and shared their thoughts.

Just as valuable were your questions and suggestions. We recorded every one, reviewed them with our engineering team, and answer them one by one below. As a result, the mass-production version of the TG-6 will include four small upgrades.

Area Demo model Mass-production version
Boiler housing edge Joined with glue Welded, no glue
Base protection Brushed metal plate on the wooden base New plate: thicker, larger coverage, new material
Fuel drawer For solid fuel tablets, with small holes on both sides Side holes sealed to hold paste-type fuel gel; gas burner accessory planned
Pressure gauge Fitted on the demo model Optional accessory, for builders who want to monitor pressure

What stays the same

  • Spring-loaded safety valve and pre-assembled water-level sight glass, as standard
  • Generator, rectifier board and gooseneck lamp included
  • Working pressure of around 2–3 bar
  • About one hour to assemble
Q

“Is the edge of the boiler housing just glued? Will that hold up over time?”

A

Upgrade 1 · Welded boiler housing edge, the classic way

A fair point, and one we heard from several builders. On the demo model, the edge of the stainless steel boiler housing was joined with glue. Glue can leave uneven seams and small gaps, and on a part that runs hot, builders told us they’d rather see a proper metal joint.

We took that on board. In the mass-production version, the glue is gone and the edge is welded instead. It’s how classic steam equipment was built: metal joined to metal, solid and durable. The result is a stronger, cleaner seam with no gaps, and the authentic, old-school look and feel that steam fans love.

Q

“What if I spill some fuel? Won’t it burn the wooden base?”

A

Upgrade 2 · A new, improved metal base plate

The demo model already had a brushed metal plate on top of the wooden base. But with a live flame on the workbench, we wanted to do better. The mass-production version gets a new, improved metal plate: it’s thicker, covers a larger area of the base, and is made from a new material, so the wooden base is better protected. If fuel spills or flares, the plate takes the heat instead of the wood underneath, and the hardwood base keeps its good looks.

Still important: the metal plate is an extra safeguard, not a reason to relax. Always run the model on a heat-resistant surface, with an adult present.

Q

“Most of us use fuel paste from a tube these days, or gas. Will the TG-6 work with that?”

A

Upgrade 3 · A sealed fuel drawer for paste-type fuel gel

This was one of the most useful things we learned at the show. The demo model runs on solid fuel tablets, and our original plan for this upgrade was to add support for alcohol gel. But talking to builders at the show, we learned that many of you now use paste-type fuel gel, the kind you squeeze out of a tube, and plenty of you run on gas.

So we’ve changed the design. The sliding fuel drawer under the boiler had small holes on both sides. On the mass-production version, those side holes are now sealed, so paste gel stays where you squeeze it instead of seeping out through the sides. That means you can use the fuel paste you already buy. Simply pull the drawer out, add the fuel, and slide it back in under the boiler. The vents on the front of the firebox stay open, so the flame still gets plenty of air.

For gas users, we’re developing a separate gas burner as an optional accessory, to be released later. We’ll share the details once it’s ready.

Please note: Fuel is not included with the kit, as it can’t be shipped. Please buy fuel gel locally before your first run. Always let the fuel burn out and the drawer cool down before pulling it out to refuel.

Q

“I like to keep an eye on the pressure. Can I get a gauge for it?”

A

Upgrade 4 · Pressure gauge as an optional accessory

Yes. Some builders love watching the needle climb as the boiler comes up to pressure, while others just want to fire it up and enjoy the lamp. So the pressure gauge is now an optional accessory: add it if you want it, skip it if you don’t.

The gauge reads from 0 to 6 bar, and the TG-6 normally runs at around 2–3 bar, so you can see exactly what the boiler is doing as the turbine spins up. Whether or not you add the gauge, the spring-loaded safety valve and water-level sight glass are standard.

Also optional: the steam whistle. On a full boiler the TG-6 typically runs for around 15 minutes. Every blast of the whistle uses steam, so frequent use can shorten that to around 8–10 minutes. Add it for the classic steam sound, and use it sparingly for longer runs.

Q

“Can I order one now?”

A

Limited first batch · 100 units

Yes, pre-orders are open now. The first batch of the upgraded TG-6 is limited to just 100 units. Keeping it small lets us check every unit closely and keep listening to the first builders, just as we did at the show. Pre-ordering now secures your unit from this first batch.

Q

“Anything else planned for the TG-6?”

A

Coming next · A worker figure

Yes, and it’s a fun one. We’re planning a worker figure made to go with the TG-6, so you can recreate a scene from a real power house: an engineer at work beside the boiler, keeping an eye on the turbine as the lamp glows. It’s a small touch that brings the whole model to life on your shelf.

It’s still early days, so this is the perfect time to tell us what you’d like to see. Which pose, which era, what size? Leave your ideas in the comments below, and they may help shape the final design.

MOTION · POWER · MECHANISMS · ENGINEERING

Thank You for Every Suggestion.

Every answer on this page started with a conversation at the show. To everyone who stopped by, tried the whistle, asked a tough question or told us what you’d change: thank you. You’ve helped make the TG-6 better for every builder who gets one.

We’re still listening. Whether it’s the worker figure, the gas burner or something new entirely, leave your ideas in the comments below — they may end up in the next version.

New to the TG-6? Read how it works in our introduction: RETROL 1st Turbine Steam Power Plant Kits.

Pre-order the RETROL TG-6 →

0 comentarios

Dejar un comentario

Meet the Author

Danna is the editor-in-chief of our website blog and has been worked with stirlingkit for over five years.

Stirlingkit

TOYAN FS-V800WGPC 1/10 Mini V8 Engine Model Building kits Run on Gas 28cc

Precio normal
de $1,099.99
Precio de venta
de $1,099.99
Precio normal
Precio unitario
por 

Stirlingkit

SEMTO ENGINE ST-NF2 DIY Build a Nitro 4 Stroke 2 Cylinder Engine Kit That Runs- FS-L200AC

Precio normal
de $199.99
Precio de venta
de $199.99
Precio normal
Precio unitario
por